Log of shop projects and general changes within the office space: 3D Printing, Lobbies, Electronics room, Classroom
Month
September 2023
- Laser water loop flow sensor is leaking. Did some temporary repairs
- Identifying the sensor type to order replacement
- Bathroom light fixture replaced
- Kitchen cabinet screwed back to wall (Appeared to be coming loose)
- Excess material purged from Electronics room
August 2023
- Rooftop AC Unit Failure
- Portable AC units spread out in the space as a stopgap
- Putting plan together to replace
- Refrigerator evaporator fan replaced
July 2023
- Replaced ballasts with LED conversions in 4 fixtures
- Motion sensor lighting added in most rooms
- Automation temperature sensors added throughout space
June 2023
- Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity
- Concrete Pavers added under 3d printers for vibration dampening
- Red Riot repaired and back online
- gMax 2 Pro donated. Work on getting it settled in progress
- Upgraded CCTV system
May 2023
- 4/5 Ender 3's standardized on Pis with screens
- Water connected to fridge
April 2023
- Work on standardizing all printers into OctoAnywhere
- 3/5 Ender 3's standardized and online
March 2023
- Laser hooked back up
February 2023
- Post-Consolidation panic
January 2023
- Consolidation panic